On the basis of brief introduction of different structural features and construction process flow of CRTSⅡslab-type ballastless track,this book introduces in detail the construction process for CRTSⅡbi-block sleeper;presents product quality control key points based on code requirement;introduces the construction preparation and main content for construction measurement to be completed before construction;introduces the logistics organization planning and construction equipment transition for CRTSⅡbi-block ballast bed;introduces the process flow of the supporting layer of CRTS Ⅱ bi-block ballastless track and bridge bed plate construction,as well as the technical key points for artificial formworking method;and introduces in detail the process flow and technical requirement for mechanical vibrating and embedding construction.