CRTSⅡ Slab Ballastless Track Track Slab Prefabrication and Laying Technology
LiChangning DaiYu GaoGuang更新时间:2020-06-29 12:01:06
最新章节:References封面
版权信息
Brief Introduction of the Book
Preface
Foreword
1 Overview of CRTS Ⅱ Slab Ballastless Track Structure
1.1 Structure of CRTS Ⅱ Track on Bridge
1.2 Structure of CRTS Ⅱ Slab Ballastless Track on Subgrade
1.3 Structure of CRTS Ⅱ Slab Ballastless Track in Tunnel
1.4 Flow of Construction Technology for CRTS Ⅱ Slab Ballastless Track
2 Prefabrication Production of CRTS ⅡTrack Slab
2.1 Basic Structural Requirement for Track Slab Yard
2.2 Tooling Equipment Configuration
2.3 Organization Management for Track Slab Construction
2.4 Material Management of Track Slab Yard
2.5 Process Flow of CRTS ⅡTrack Slab
2.6 Key Points of Critical Processes
2.7 Concrete Slab Construction Operation
2.8 Quality Control
3 Subgrade Surface Treatment and Acceptance
3.1 Beam Surface Treatment and Acceptance
3.2 Acceptance of Subgrade Surface and Tunnel Foundation Construction
3.3 Quality Control
4 Waterproof Layer Construction
4.1 System Structure of Waterproof Layer
4.2 Construction Procedure and Technological Process
4.3 Process Conditions for Spraying Construction
4.4 Construction Method
4.5 Inspection Acceptance
4.6 Construction Preparation of Waterproof Layer
4.7 Organization of Construction Workers
4.8 Quality Control
5 Construction of Sliding Layer and Extruded Sheet
5.1 Construction Technology Process
5.2 Extruded Sheet Laying
5.3 Construction of“Two Fabrics One Film”Sliding Layer
5.4 Personnel Allocation for Working Face
5.5 Configuration of Machine and Equipment
5.6 Quality Control
6 Construction of Bed Plate on Bridge
6.1 Unit Division,Surveying and Setting out for Bed Plate Construction
6.2 Shear Alveolar Treatment and Shear Nail Installation
6.3 Steel Bar Tying
6.4 Fabrication and Installation of Steel Plate Connector
6.5 Construction of Bed Plate Formwork
6.6 Concrete Pouring and Curing
6.7 Construction of Longitudinal Tensioning Connection for Bed Plate
6.8 Quality Control
7 Construction of Supporting Layerfor Subgrade and Tunnel
7.1 Construction Process Flow ofSupporting Layer for Subgrade and Tunnel
7.2 Construction of Supporting Layer Surface
7.3 Personnel Allocation
7.4 Machine and Equipment Allocation
7.5 Construction of Fixed Terminal Spineand Friction Board on Subgrade
7.6 Quality Control
8 Track Slab Laying and Fine Adjustment
8.1 Process Flow for Track Slab Laying and Fine Adjustment
8.2 Track Slab Transport and Temporary Storage
8.3 Track Slab Rough Laying
8.4 Track Slab Rough Adjustment
8.5 Track Slab Fine Adjustment
8.6 Quality Control
9 Cement Emulsified Asphalt Mortar Pouring
9.1 Pouring Process of Cement Emulsified Asphalt Mortar
9.2 Construction Preparation before Pouring
9.3 Preparation and Transport ofCement Emulsified Asphalt Mortar
9.4 Quality Control
10 Construction of Lateral Baffle
10.1 Construction Preparation
10.2 Construction Technology of Lateral Baffle
10.3 Quality Control
References
更新时间:2020-06-29 12:01:06